22 Sep 2020

Tom’s Update – September 22, 2020

2020-09-22T17:37:57-04:00September 22nd, 2020|

To All,

The High rise painting project is going well, however, we ran into an issue of taking the 40 year old railings off. What we found, and this is hit and miss on different lanai’s, is spalling (bad concrete). With the both contractors tight schedule and time enough to fix issues, this is […]

28 Aug 2020

Tom’s Update – August 28, 2020

2020-08-28T16:01:32-04:00August 28th, 2020|

To All,

Artistry Painting is just about done setting up the swing stage on the west side of the High rise and will paint the building clock wise. They will pressure clean first then paint.

The new railings arrive today and will be installed a side at a time. If you have furniture out […]

31 Jul 2020

Tom’s Update – July 31, 2020

2020-08-28T16:01:25-04:00July 31st, 2020|

To All,

With window and painting projects there are a lot of moving parts that have to happen to keep the momentum moving forward. All 30 windows have been installed in the Mid rise building and only
4 left to stucco on the outside and 6 left to touch up on the inside. Thankfully we […]

10 Jun 2020

Tom’s Update – June 10, 2020

2020-06-10T15:26:41-04:00June 10th, 2020|

To All,

Starting on June 22, we will begin to install the windows in the Mid rise buildings and it should take a couple of weeks to install all of them. As it stands now we will begin installing the new railings for the High rise the first week in July.

With those two […]

7 May 2020

Tom’s Update – May 7, 2020

2020-05-11T12:24:01-04:00May 7th, 2020|

To All,

On Tuesday the high rise transformer shorted out and not sure why it did. F.P.L. installed a temporary line and will be back Monday 5/11/20 to install a new underground line at no cost to us.There should be no power outage while this is being done.

We have changed pest control companies […]

26 Aug 2019

Tom’s Update – August 26, 2019

2020-05-11T12:24:09-04:00August 26th, 2019|

To All,

Well it finally stopped raining long enough to get some projects accomplished this month from all the rain the last seven weeks .

The Mid rise stairs have been painted and each of the treads was leveled with the angle iron that sit on top of the front of them to stop a […]

28 Jun 2019

Tom’s Update – Code Enforcement – Turtles

2019-06-28T20:23:03-04:00June 28th, 2019|

To All,

I received a phone call from the City Of Venice Code Violations Department yesterday issuing a verbal first warning to Mac Arthur Beach for leaving chairs and umbrellas on the beach and not shutting blinds on sliding glass doors and windows on the High rise. Please let your guest know to keep […]

25 Jun 2019

Tom’s Update – June 25, 2019

2019-06-28T20:33:05-04:00June 25th, 2019|

To All,

The termite tenting of the Low rise buildings was a success and that we dug all the trenches around the buildings for the tarps we only lost a couple of plants when the residual leaf die off was over. The new LED lobby lights and ceiling tiles have been installed and waiting […]

3 Jan 2019

Tom’s Update – January 3, 2019

2019-01-03T21:12:45-05:00January 3rd, 2019|

To All,

2019 came in with a bang for we had an unfortunate incident of a small fire in the High rise dumpster room. The incident is still under investigation and the boil water notice has been lifted. On new Years Eve around 9:30pm someone threw out something that still had an ember in […]

6 Dec 2018

Tom’s Update – December 6, 2018

2018-12-06T21:39:30-05:00December 6th, 2018|

To All,

The roofing and the painting projects on the Low rise have been going smooth and on time and budget. Mario’s Painting is about 86.5% done and are around the 225/226 buildings to finish at 229/230 building probably right before Christmas.

Avery Roofing is about 74.6% done and is around the 207/208 building […]